.Description:
E-bike/E-scooter AC(Slow) Charging Station-Q10B
is the professional power management system which is suitable to use as the safe and convenient facility in the communities, hospital, school, supermarket and the other place the e-bikes concentrated, and avoid the irregularly pulling wires to charge and eliminating the fire risk. and solve the troubles of the handling battery. Completely avoiding the electricity losses due to privately pull socket for charging in the company.It's very popular to install it in the communities and the above mentioned place as a safe and convenient facility for peoples.
Characteristics:
- Simultaneously managing the power-off time for 10 routes sockets
- 10 routes nixie tube countdown display, max. time can display 99.9 hours, and automatic power off at zero in the countdown
- 10 routes power output indication
- Max. power limit function: The operator can set 50-600W of itself
- Max coin number can be set by operator
- Free charging time can be set by operator
- Automatically determine the power of the charge outlet, and adjust the charge time accordingly.
- Electricity metering function for easy calculation of electricity bills.
- The operator can set the power-on time of single coin, 1-999 minutes adjustable.
- All-round voice guide function: Loading accessed, Power supply complete, loading disconnected, overloading prompts and etc.
- Complete protection function: With the leakage protection, output short-circuit protection, overloading protection.
- Wall-mounted design, water-proof grade Ip31
- Coin counting function, convenient for operator to manage the revenue
- With the power-off protection function, after power failure and power-on again, automatic resume the time before power failure and continue working.
- Counterfeit currency identification function, the counterfeit coin such as the game coin inserted will automatically be returned back.
- The card module and recharge system are optional.
Technical Specification
Model No.: |
Q10B |
Input Power: |
AC 220V±10%/50HZ |
Main Function: |
AC power management |
Charge channels: |
10 |
Max. input current: |
40A |
Max. output current of single channel: |
5A |
No-load power: |
5W |
Max. power output: |
600W |
Output volts of single channel: |
AC 220V±10%/50HZ |
Payment method: |
Coin, card swiping |
Single coin charging time:: |
1-999 minutes adjustable |
Max. coins qty per charge: |
10(customizable) |
Waterproof Class: |
IP31 |
Shell Material: |
Steel |
Surface treatment: |
Spraying plastic |
Color and pattern: |
Customized |
Optional accessories: |
Waterproof cover |
Product size: |
32*14*52 cm |
Packing size: |
38*20*60 cm |
Weight: |
7.85 KG |
It can be updated to the networking charging station after installing the e-box, scanning the Alipy or WeChat to pay |
Usage:
Step no.1: Selecting the charging socket, then connecting the socket and electric bicycle by the charger, at this point, the voice guider prompt "No.1 socket is connected"
Step no.2: After insert the coin successfully, then press the button corresponding to the socket number, the charge starts.
Query and setup of main-board
The main-board's query and setup need to open the case for setting. Totally 5 software functions can be set to view:
1. Query historical total coin number
Long press the small button at the back of main-board for about 2 seconds(i.e. main-board setting button, as shown in figure 1) to enter the setting interface, the ninth and tenth nixie tube shows a continuous 6 digit number, which means the total number of coins inserted.(as shown figure 2)
2. Setting power-on time of one coin
Enter the setting interface as per the operation of first step, the number displayed by the fifth nixie tube is the power-on time of a single coin(unit: minute), pressing the button no.5 or no.6 to increase or decrease the number.(as shown in figure 3: One coin for 180 minutes power supply )
3. Selecting max. loading power
Entering the setting interface as per the operation of the first step, the number displayed by the third nixie tube is the max. loading power, pressing the button no.3 to switch between 50 and 500W(Step length is 50), when the loading power exceeded the set value, the system will prompt overload, after a certain number of voice prompts, the system will automatically cut off the power of this route(as shown in figure 4)
4. Clear remaining charge time
Entering the setting interface as per the operation of the first step, the first nixie tube displays CLE(Flash state ), press button no.1, the CLE displayed by the first nixie tube keep on, then the system will clear the remaining power-on time.(as shown in figure 5)
5. Power off saving switch
Entering the setting interface as per the operation of the first step, the 8th route displays OFF to indicates the power-off saving function is off, ON indicates the power-off saving function is on . Pressing the button no.8 to switch between OFF and ON state(as shown in Figure 5).
6. Check the number of coins
Press and hold 10th button for 10 seconds to display the number of coins.
Installation Instructions
- Choose to install on a wall or column in outdoor environment such as the carport, perforte on the wall according to the hole distance of 4 holes at the back of case cover, and fix the device with expansion screws.
- Refers to the wire length of normal electric bicycle charger, the mounting height of host is 100-150 cm from the case bottom to the ground, output socket is 50-60cm away from case bottom, the distance between each socket keep 50-100 cm.
- Material required for device installation:
Wire Types |
Specification |
Quantities |
System power corn(Null line, live line) |
4 SQMM copper wire |
Depend on the actual distance |
Control corn(small board with 10 pcs of output cable) |
1 SQMM copper wire |
normally 60-80 M |
Earth wire |
1.5 SQMM strand wires |
Depend on the actual distance |
Cable tube |
Dia.: 20mm |
15-20M (input wires not included) |
Bend |
Dia: 20mm |
<3pcs |
Three-way |
Dia: 20mm |
10pcs |
Power socket |
2 holes/10A/anti-electric shock socket |
10pcs |
Socket case |
Fire-resistant PVC with water-proof cover |
10pcs |
Installation diagram
Installation diagram
Installation diagram
APPLICATION CASES
About us:
Founded in 2005,
DEKANG is a high-tech enterprise involved in researching & development, production and sales of Storage Battery Detection Equipment, Charging Station, Shared Mobility Solution. We provide the clients with the complete solution of storage batter service.
Products Category:
Battery Charging & Discharging Detector
Battery Detection and Recovery Equipment
E-Bike/E-scooter Charging Station
Shared Battery Charging & Swapping System
Intelligent Lithium Batteries
Battery-swapping E-bike/E-scooter and so on.
Why choice us?
- Beginning from 2005, we have achieved the leadership of our industrial
- Over 15 years of experiences
- Powerful function and superior performance
- Professional and strong R&D team.
- Technical leadership and advantage
- Advanced production technology and automatic assembly line
- Market verification and specialized users approval from over 50 countries
- Rich experience in market operation
- Professional after-sale service, lifelong after-sale service provided
Delivery
Sample order dispatched by express via DHL, FEDEX,TNT,UPS or any other express services you prefer to, also we can coordinate to send it to other agreed address in China for loading with your convenience
Normal order delivered by sea or air as per your instructions.
Warranty:
12-month warranty, lifelong after-sale service and free technology service.
After-sales service
Free replacement parts will be provided during the warranty period, and we will dispatch the replacement parts to the user by DHL,UPS,TNT or FEDEX at our account and guide the user to replace via phone, email or video.
After the warranty period, the cost of replacement parts will be charged. If you pay for the replacement parts, you can enjoy free warranty within half a year from the maintenance date for the same problem.
Lifelong free technology service provided by us, the users can advise malfunction and inquire the maintenance technology through the telephone, fax, email, and social media, etc.
Paid service
The conditions in the below not included in the free maintenance range, the company provide with the paid service, kindly note:
- Do not operate or use as per the manual and cause the damage
- The instrument was disassembled or repaired by the non-authorized person by our company
- Unexpected factors or man-made causes the damage, such as the water inflowing, mechanical damage, falling, burning and so on.
EXPO
R & D
PRODUCTION
DEKANG IMAGES